2 Well Pad - Wellhead location confirmations, Pile and Equiptment Layout

Project note
Eclipse Issued piping with required holds for fabrication prior wellheads being installed. Our feild team arrives on site to measure wellhead casing and conductor to confirm piping elevations. Our crew pins, cuts and caps the piles and sets center of sleepers. The tank centers, containment edges and edges of rig mats to pull for field crews. All equipment points are provided with offsets to allow for the movement of equipment.