Project / Western Canada

Construction Validation for a Greenfield SAGD Pad

3D Laser Scanning · Piping & Structural Design · Pile Layout · Construction Support

A crane lowers a prefabricated utility building onto a field of installed piles while a survey crew verifies its placement.

Project note

Eclipse maintained dimensional control for an eight-well SAGD pilot project in Alberta. Our team scanned the site after the wells and risers were installed, laid out approximately 500 piles, and combined scan and total-station data with vendor piping models to verify field fit before installation.Modify field piping where needed

A Topcon total station set up among installed piles at a snow-covered SAGD construction site.
A coordinated 3D model and point-cloud view showing pipe racks, piping systems, equipment, and pile locations.
A construction validation drawing comparing surveyed pipe-rack assemblies in plan, elevation, isometric, and flange-coordinate views.